Michigan's SFY2027 Clean Water SRF and Drinking Water SRF intended use plans, as adopted October 2026, show 213 projects as of November 2026, down from 215 in the prior period. Tracked value across the list stands at $1.9B. The Michigan Department of Environment, Great Lakes, and Energy's current documents record 125 new listings worth $1.2B and 37 projects that entered the fundable range worth $241.5M, the closest signal to imminent procurement. Twenty projects climbed in priority rank, and eight saw their requested amount change on file, with six moving down and two moving up for a net change of -$21.5M across the tracked estimates.
Pump Station Improvements. Requested $190.0M.
CSO Separation, Biosolids Improvements. Requested $100.0M.
Lead Service Line Replacement. Requested $69.0M.
The most concrete movement this cycle belongs to Great Lakes Water Authority, whose Pump Station Improvements project appeared on the priority list for the first time with a requested amount of $190.0M, and City of Lansing, whose CSO Separation, Biosolids Improvements project was added to the list at $100.0M. Both entries sit in the Clean Water / Wastewater program and represent two of the largest new listings on the current roster.
Further down the list, Muskegon County Board of Public Works entered the fundable range with its Forcemain Improvements project, requested at $36.0M, and City of Battle Creek, Michigan entered the fundable range for Lead Service Line Replacement at $27.9M under the Drinking Water program. Separately, Cheboygan, City of and City of St. Joseph each climbed in priority rank on their respective Lead Service Line Replacement projects, requested at $895K and $5.0M.
Across the category rollup, lead service lines lead the list by both count and value, with 125 projects totaling $793.3M, followed by watermain and distribution work at 75 projects and $613.6M. Collection and sewer projects account for 32 entries worth $424.3M, while wastewater treatment, though fewer in number at 11, carries $336.3M in value. Lift and pump stations and water treatment round out the rollup at 12 and 21 projects respectively, valued at $302.4M and $201.5M.
The fundable-range total of $241.5M across 37 projects marks the clearest concentration of near-term activity on the current IUP roster, set against a list that moved from 215 to 213 projects this period. The Michigan Department of Environment, Great Lakes, and Energy's documents do not state why any project no longer appears on the list.
Projects the state has flagged as fundable — the closest signal to imminent procurement. Ordered by requested amount.
| Entity | Scope | Program | Requested |
|---|---|---|---|
| Muskegon County Board of Public Works | Forcemain Improvements | CWSRF | $36.0M |
| City of Battle Creek, Michigan | Lead Service Line Replacement | DWSRF | $27.9M |
| Iron River Township | Water Main Replacement, Valve Replacement, and Storage Tank Improvements | DWSRF | $20.6M |
| City of Brighton | WWTP Improvements | CWSRF | $13.7M |
| City of Ferndale | Lead Service Line Replacement | DWSRF | $12.5M |
| City of Warren | Lead Service Line Replacement | DWSRF | $12.0M |
| Benton Charter Township | Water Main Replacement and Water Treatment Plant Reservoir Construction | DWSRF | $10.4M |
| Charter Township of Independence | Water Main Extension for PFAS Environmental Compliance | DWSRF | $9.7M |
Projects that climbed materially in priority (rank, or priority score where a state scores projects) since the previous list — the least-watched signal in the document.
| Entity | Scope | Program | Rank movement |
|---|---|---|---|
| Cheboygan, City of | Lead Service Line Replacement | DWSRF | score 20 → 40 |
| City of St. Joseph | Lead Service Line Replacement | DWSRF | score 22 → 32 |
| City of Yale | Sewer System Improvements, Asset Management Planning | CWSRF | score 60 → 70 |
| Iron River Township | Water Main Replacement, Valve Replacement, and Storage Tank Improvements | DWSRF | score 36 → 43 |
| Village of Marion | Water Main Replacement and Lead Service Line Replacement | DWSRF | score 57 → 62 |
| City of Saginaw | Water Main Replacement and Lead Service Line Replacement | DWSRF | score 49 → 54 |
| City of Jackson | Water Treatment Plant Improvements, Water Main Replacement, and Lead Service Line Replacement | DWSRF | score 41 → 46 |
| City of Owosso | Water Main Replacement and Lead Service Line Replacement | DWSRF | score 34 → 39 |
| City of Grand Rapids | Water Main Replacement, Lead Service Line Replacement, and Storage Tank Improvements | DWSRF | score 26 → 31 |
| Village of Athens | Water Treatment Plant Improvements, Water Main Replacement, System Looping, Lead Service Line Replacement, and Water Main Extension | DWSRF | score 26 → 31 |
| City of St. Joseph | Water Main Replacement, Water Treatment Plant | DWSRF | score 19 → 24 |
| City of Lowell | Water Main Looping | DWSRF | score 11 → 16 |
Projects seeking SRF financing — not every municipal water or wastewater project in Michigan. Source: Michigan Department of Environment, Great Lakes, and Energy — Clean Water SRF, Drinking Water SRF (IUP/PPL). Stages are labeled precisely; "no longer listed" does not assert an outcome.