The Kansas Department of Health and Environment's SFY2027 Clean Water SRF (IUP) and SFY2027 Drinking Water SRF (IUP), adopted June and July 2026, show a priority list that grew from 169 to 171 projects, with a tracked value of $846.7M across the current roster. Compared with the SFY2026 Clean Water SRF (IUP) and SFY2026 Drinking Water SRF (IUP), 110 projects appeared on the priority list for the first time, carrying a combined $490.7M, while 3 projects entered the fundable range worth $37.6M. Thirteen projects saw their cost estimate on file change, with 8 up and 5 down, a net movement of -$174.2M. The list does not say why projects leave; 2 projects showed a rank up this cycle.
New Wastewater Treatment Facility. Requested $30.0M.
Rehab and Upgrade WWTP to Improve Nutrient Removal. Requested $55.0M.
South WTP expansion. Requested $52.0M.
The most concrete movement this cycle belongs to Leavenworth Waterworks Board, where a South WTP expansion was added to the list under the Drinking Water SRF with a requested $52.0M, and PWWSD #12, where a WTP expansion & Transmission mains project was added to the list requesting $30.0M. Both entries land in the water treatment category, which shows 24 projects valued at $149.2M in the current category_rollup.
Spring Hill's New Wastewater Treatment Facility entered the fundable range this cycle, requesting $30.0M under the Clean Water program, and Caldwell's Waterline Replacement also entered the fundable range at a requested $5.8M under Drinking Water. Elsewhere, Chapman's Wastewater Lagoon Facility Improvements, Incl. Addition of Wetland Cell and Coldwater's Sanitary Sewer Collection System Rehabilitation/Replacement both climbed in priority rank, requesting $1.2M and $660K respectively.
Across the category_rollup, wastewater treatment remains the largest single category by both count and value, with 33 projects totaling $297.2M, followed by collection & sewer at 28 projects and $115.0M. Lagoons & ponds show 16 projects worth $44.4M, while stormwater and nutrient removal each register smaller counts, 2 and 1 respectively, but carry substantial value at $68.4M and $55.0M, a reminder that project count alone does not track with dollar value on this list.
The strongest concrete fact this cycle is the scale of new volume: 110 projects appeared on the priority list for the first time, a figure that dwarfs the 3 that moved into the fundable range, underscoring how much of the current $846.7M total reflects entries still earlier in the pipeline under the Kansas Department of Health and Environment's SFY2027 IUPs.
Projects the state has flagged as fundable — the closest signal to imminent procurement. Ordered by requested amount.
| Entity | Scope | Program | Requested |
|---|---|---|---|
| Spring Hill | New Wastewater Treatment Facility | CWSRF | $30.0M |
| Caldwell | Waterline Replacement | DWSRF | $5.8M |
| Robinson | Waterline Replacement | DWSRF | $1.8M |
Projects that climbed materially in priority (rank, or priority score where a state scores projects) since the previous list — the least-watched signal in the document.
| Entity | Scope | Program | Rank movement |
|---|---|---|---|
| Chapman | Wastewater Lagoon Facility Improvements, Incl. Addition of Wetland Cell | CWSRF | score 45 → 65 |
| Coldwater | Sanitary Sewer Collection System Rehabilitation/Replacement | CWSRF | score 22 → 27 |
Projects seeking SRF financing — not every municipal water or wastewater project in Kansas. Source: Kansas Department of Health and Environment — Clean Water SRF, Drinking Water SRF (IUP/PPL). Kansas lists base, lead service line and emerging contaminants projects separately, and each listing is tracked as its own project. KDHE often gives a re-listed drinking-water project a new number; it's linked to its earlier listing only when the applicant and description match exactly, so some re-listed projects appear as new. Stages are labeled precisely; "no longer listed" does not assert an outcome.